Internal Audit
Scope: This document is intended to define the requirements of the internal audit program at Prime Machine Inc. The elements of the program that will be discussed are: the basis or audit criteria, audit schedule, frequency of audits, qualifications of personnel performing the audits, the format for reporting the results, and corrective action policy.Purpose: The purpose of this document is to assure conformance to existing procedures and policies and to determine the effectiveness of those procedures and policies. Reference documents: PMF-105 Process Improvements Qform-210 Audit schedule Qform-211 Audit report 1.0 Audit basis The majority of audits within the scope of this document shall be Process Audits. The criteria or basis material for the audit will, in most cases, be the Prime Machine Procedures (PMP- documents) Process Flows PMF-Documents and the associated forms. Compliance to these documents shall be the baseline for identifying audit findings. The audit criteria may also be based upon any observed discrepancy either detected in-house, by a customer or through the Non-Conforming Material Process PMP-107. In this case a Product audit may be undertaken to determine what process may have led to the Product non-conformity. 2.0 Audit schedule The audits will be scheduled on an annual basis. The planning process for the audit schedule will take into account past audit findings, as well as processes that have a greater affect on delivered product. An audit schedule will be created for each calendar year as noted in the example in Table (1) Deviations form this schedule may occur based upon needs as defined in section (1) above. 3.0 Auditors qualifications Any individual conducting internal audits shall posses the adequate skills and training needed to perform the audits in a competent and professional manner. This training may be in-house training provided by the Quality Administrator or be obtained at third party outside sources 4.0 Audit execution All audits will be performed in a professional manner. Notification of the audit will be made to the to a affected area personnel. These personnel will be informed of the date and time of the audit and what specific procedures will be uses as the basis. Upon execution of the audit, all issues will be noted on the audit report form Qform-203. Audit issues will be characterized as follows:
5.0 Corrective action policy All Audit comments observations and finding will be documented on the Audit report Qform-203. This report will be discussed with area personnel to clarify and assure understanding of the nature of the report. Only finding will require a written statement of corrective action form the audited area. After a reasonable implementation time verification shall be made that the finding has been corrected. Audit results will be summarized for each management review. Observed trends will be identified as well as significant chronic failures of the QMS. The management team will develop preventive action plans as an output of the management review.
Table (2) Audit Report Example
--- End PMI PMP-006 --- Copyright 1997-2011 Prime Machine, Inc.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||