Scope: This document is intended to define
the procedure to control the following documents used in the course of
business at Prime Machine These documents include; internal procedures,
NCR Reports, Customer Purchase orders, Customer drawings, Customer Data
sets and job files. All internal documents will be maintained as
electronic files. All printed copies of internal documents are
considered reference only and the revision status must be verified prior
to use.
References:
PMP-002 Control of Records
PMP-003 Process Control
QForm- 205 Master Document Log
PMP-007 Control of Non-conforming Materials
E-Doc Global Solutions job log
1.0 Internal document Identification
Internally created documents will be named with the
following prefixes:
PMP-0xx Prime Machine Procedure
PMF-1xx Prime Machine Process Flow
Qform-2xx-5xx Quality Management System Form
PPC-5xx Prime Machine Procedure Control (Formerly PCP)
As new documents are created they will be assigned the next
sequential number in the series for each document type: PMP-008, PMP-009…
The document will be logged onto Q-form-205 with the initial revision
letter to be “A”, or “NC” for initial releases.
2.0 Control of Internal Documents
Each procedure designated as PMP-0xx shall have a
header that defines current revision of the document and contains the
document title. This header also contains the revision log for
subsequent changes. As a PMP document is revised, the reason for the
revision shall be entered into the appropriate space and approval of the
changes shall be indicated by the initials in the appropriate space. As
Process flows, PMF-1yy, and Qform-2zz Documents are revised, the
revision letter in the header shall be updated to the next sequential
letter.
Each time an internal document is changed the following activities
will be performed:
ü
Qform-205 will be updated to the
next letter.
ü
Work in progress will be reviewed
for impacts.
ü
Hard copies will be revised.
ü
Staff will be trained on the
changes.
3.0 Control of Customer Purchase Orders
As a customer P.O. is received it is entered in to the Global
Solutions Shop Control software. The customer’s P.O. revision number
is entered as appropriate. A job file number will be created at this
time. A hard copy of the customer P.O. is filed with the job file.
3.1 Revisions to Customer P.O.
As revisions are made to the customer P.O., the revision status is
updated on the Global Solutions Shop Control software. A review of the
changes are made to determine if the Work Order must be revised and if
WIP is affected. If WIP is affected the Traveler will be revised in
accordance with PMP-003 Process Control and WIP will be dispositioned in
accordance with PMP-007 control of non conforming materials. The revised
P.O. hard copy will be filed in the appropriate Job File.
If the P.O. revisions adds cost to the WIP or future orders, a letter
will be sent to the customer identifying the increased scope and cost as
a result of the P.O. change. This letter will be kept in the job file.
4.0 Control of Customer Drawings
This section defines control of customer drawings and datasets.
4.1 New Drawings and Datasets
As customer drawings and or data sets are received they will be
reviewed by PMI personnel for content and applicability. If the
drawings/data sets are approved for use they will be entered into the
Global Solutions Shop Control system. The current revisions approved for
use are only those noted within the Global Solutions data base. The
revision of the drawing/data set will be noted as appropriate and in the
case of data sets without revisions noted the date of receipt shall be
considered the revision level. In the event the paper drawing and
dataset disagree, the customer will be notified and request made to
properly identify the true product definition. The hard copy drawing
will be maintained in the job folder with all pertinent data relating to
the work package. The electronic data sets shall be maintained in a data
library server.
4.2 Revised Drawings
As revised drawings are received from the customer, the Global
Solutions Shop Control system will be revised to reflect the changes.
The old revisions will identified as obsolete on the actual copy of the
drawing, but will remain in the job file in accordance with PMP-002
Control of Records. When the new drawings are received, all work in
progress shall be reviewed for any impacts, including any proposals in
progress, to determine any actions to be taken. If WIP is affected the
shop router will be revised in accordance with PMP-003 Process Control
and any non conforming WIP will be dispositioned in accordance with
PMP-007 Control of NCR.
If submitted Proposals are affected, a revised proposal and /or a
letter for cost increases due to scope change, will be submitted to the
customer.
If the drawing revisions adds cost to the WIP or future orders, a
letter will be sent to the customer identifying the increases scope and
cost as a result of the drawing change.
5.0 Control of External Documents
External documents such as ASTMs, Mil Specs, ISO documents and other
recognized standards will not be maintained in house at Prime Machine.
These documents that reside in house will be considered reference only
within the document control system and will not be maintained. As the
need arises to use these documents the current revisions shall be
verified as the most current before use. If the copy in house is out of
date current copies will be retrieved from controlled sources.
6.0 Record Retention:
There will be separate files that will be used to manage the control
of the documents referenced herein. Procedure PMP-002 Control of Records
will provide additional information on the record retentions policy. Two
hard copy files will exist; one for all job related data; completed job
folders and one for all Quality Management system related data.

--- End PMI PMP-001 ---